Антверпен — Разные фотографии
Turnhoutsebaan
Tunnel entrance / exit at Foorplein
This tunnel is used by line 10, the tunnel section is about 2700 m long with exit at the Frankrijklei.
Line 10 services the following metro stations: Foorplein(not in operation, no opening date planned) – Zegel – Drink (not in operation, will be opened in the spring of 2026) – Carnot(not in operation, no opening date planned) – Astrid (cross station) – Opera (cross station).
29 апреля 2024 г., понедельник Автор: AntwerpMetro
|