4 juillet 2023

The M4 line of the Metropolitana di Milano has been extended from Dateo to San Babila, along with one intermediate station Tricolore. Thus, the line is now connected to the rest of the metro network: San Babila station provides possibility to change for the line M1.

26 novembre 2022

The new metro line М4Linate Aeroporto — Dateo is opened.
The first 5.3 km-long segment of the line includes 6 stations: Linate Aeroporto, Repetti, Stazione Forlanini, Argonne, Susa and Dateo. The new line will not be connected to the rest of the metro system until the future Dateo — San Babila segment is built.

1 octobre 2022

Закрывается трамвайный междугородный маршрут 179 (Milano — Limbiate). Основная причина закрытия — проведение КП сильно изношенной инфраструктуры, с последующим отстранением от регулярных пассажирских перевозок устарелых вагонов серии Bloccati 500. Планируется в будущем конвертировать линию под метро-трам, используя в качестве ПС новые трамваи марки Stadler.

20 décembre 2021

Первый день эксплуатации электробуса модели BYD K9UB.

19 novembre 2021

Первый день эксплуатации сочленённых троллейбусов на маршруте 93 (Lambrate FS M2 — V.le Omero)

1 mai 2020

Первый день регулярной эксплуатации новых троллейбусов Solaris Trollino IV 18.

5 février 2019

Тендер на поставку 80 трамваев (50 городских, 30 пригородных) за 213 млн. евро выиграл Stadler Rail Valencia S.A.
Основные характеристики трамваев: макс. 26 метров длины, низкопольная центральная часть
http://www.ansa.it/lombardia/notizie/201...5e662.html

6 novembre 2018

Открыто новое разворотное кольцо "Certosa FS".

8 septembre 2018

Rozzano's extension Rozzano, via Cabrini — Rozzano, Guido Rossa (1,8 km) is in service now.

2 août 2018

Подтверждено выделение финансов 90 млн. евро на закупку двухсторонних трамваев, 8.84 млн. евро для интерурбана Milano-Limbiate, 180.99 млн. евро для модернизации линии метро М2, 103.55 млн. евро на улучшение линии метро М4, 8.82 млн. евро на выделенную полосу для троллеубуса на участке piazza Cappelli — Tertulliano, 4 млн. евро на выделенную полосу для троллеубуса на участке piazza Pergolesi — Piccinini.
https://cityrailways.com/mit-1700-milioni/34365/

16 juillet 2018

Подписан контракт на поставку 12 составов "Leonardo". Это позволит к 2020-му году полностью обновить ПС линии М2 (100% "Leonardo" и "Meneghino". Использование только нового ПС позволит снизить минимальный интервал до 90 секунд и снизить средний возраст ПС до 5 лет.

27 mars 2018

2 new Solaris Urbino IV 12 Electric started service on route "84". The order includes 25 electric buses, that will be delivered before end of year.

15 mars 2018

Solaris won the contract to deliver 80 new Trollino 18,75 MetroStyle trolleybuses with Kiepe Electric equipment. The Esslingen 504 was tested on Milan's Lines 90/91 this February — March.

16 février 2018

The project of the route №7 extension till intersection of streets Adriano and Vipiteno was approved. Budget — 16 millions of euro, project must be concluded in 2021.

20 novembre 2017

90-th aniversary of "Ventotto" (milan version of Peter Witt) also called "Carrelli".

11 septembre 2017

Following rail maintenance the suburban Comasina — Limbiate tramway line reopens for service. The new schedule: Monday — Saturday 5:11-9:54 and 16:28-20:58.
https://www.atm.it/it/ViaggiaConNoi/Info...ntram.aspx

12 juin 2017

Suburban tramway line "Comasina"-"Limbiate": service suspended for rail maintenance.

1 juin 2017

From 01/06/2017 till 03/09/2017 line 9 runs "Porta Genova" — "Cairoli M1".

1 mai 2017

Suburban tramway "Comasina"-"Limbiate" is split in two pieces "Comasina"-"Cassina Amata" and "Cassina Amata"-"Limbiate".

27 avril 2017

The tram Line 23 closes. The Line 19 is extended to Lambrate FS in place of the Line 23. The Line 27 is rerouted to Duomo instead of the former terminal Piazza 6 Febbraio. The extended Line 19 now serves the segment between Piazza 6 Febbraio and Duomo in place of the Line 27. The service on the Line 24 is increased by 26 round trips daily. The Lines 15 and 24 exchange terminals — the Line 15 now operates to Via Dogana, while the Line 24 operates to Piazza Fontana.

14 novembre 2015

На линии метро M5 открыта новая станция Tre Torri.

11 octobre 2015

На линии метро M5 открыта новая станция Monumentale.

26 septembre 2015

На линии метро M5 открыта новая станция Gerusalemme.

20 juin 2015

На линии метро M5 открыта новая станция Cenisio.

6 juin 2015

На линии метро M5 открыта новая станция Portello.

29 avril 2015

Линия метро M5 продлена от Garibaldi FS до San Siro Stadio.

1 novembre 2014

1 ноября исполняется 50 миланскому метрополитену

1 mars 2014

Линия метро M5 продлена от Zara до Garibaldi FS.

10 février 2013

Открыта новая (четвёртая по счёту) линия метро M5Bignami — Zara.

26 mars 2011

Третья линия метро M3 продлена от Maciachini до Comasina.