TransPhotoElektrinis miestų viešasis transportas

Chronologija: Vaslui

Grįžti į miesto puslapį

Pridėti įrašą  ·  Paieška naujienose

2024 m. gegužės 16 d.

Publication of tender for purchase of 13 electric buses (10m) through the National Recovery and Resilience Plan.

2021 m. vasario 18 d.

Republication of tender for purchase of 10 trolleybuses (12m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
14.07.2021: contract was signed with Solaris Bus & Coach.
2023: all trolleybuses were delivered.

2016 m. birželio 13 d.

A test run with passengers via the reinstated and lengthened single trolleybus line. One of the three ex-Salzburg second-hand trolleybus was used. The new route will receive designation as the Line T. The line is extended from the former Textila Terminal for further 2 km. to Moara Grecilor. The total length of the line will thus constitute 6,5 km. The regular service commencement date is unknown. Trolleybus service was suspended since 07.07.2009.
http://transphoto.ru/photo/910443/

2009 m. liepos 7 d.

Closure of the trolleybus operation in the city.

1994 m. gegužės 1 d.

Opening of the Vaslui trolleybus system.