Модель |
Постр. |
С... |
Нач.раб. |
Примечание |
1001 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 03.2012 |
≤ 04.2012 |
До ≈ 12.2011 — Comeng Phase 1 LRV |
1002 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 03.2013 |
≤ 04.2013 |
До ≈ 02.2013 — Comeng Phase 1 LRV |
1003 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 12.2012 |
≤ 12.2012 |
До ≈ 10.2012 — Comeng Phase 1 LRV |
1004 |
Comeng Phase I LRV (mod. UGL) |
1987 |
26.05.2011 |
27.07.2011 |
До 26.05.2011 — Comeng Phase 1 LRV |
1005 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≈ 01.2011 |
≈ 31.01.2011 |
До ≈ 01.2011 — Comeng Phase 1 LRV |
1006 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≈ 01.2013 |
≈ 01.2013 |
До ≈ 01.2013 — Comeng Phase 1 LRV |
1007 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 04.2013 |
≤ 05.2013 |
До 03.2013 — Comeng Phase 1 LRV |
1008 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≈ 05.2013 |
≈ 05.2013 |
До 03.2013 — Comeng Phase 1 LRV |
1009 |
Comeng Phase I LRV (mod. UGL) |
1988 |
09.2013 |
09.2013 |
До 07.2013 — Comeng Phase 1 LRV |
1010 |
Comeng Phase I LRV (mod. UGL) |
1988 |
12.2011 |
12.2011 |
До 08.2011 — Comeng Phase 1 LRV |
1011 |
Comeng Phase I LRV (mod. UGL) |
1988 |
10.2013 |
10.2013 |
До 08.2013 — Comeng Phase 1 LRV |
1012 |
Comeng Phase I LRV (mod. UGL) |
1988 |
11.2013 |
11.2013 |
До 10.2013 — Comeng Phase 1 LRV |
1014 |
Comeng Phase I LRV (mod. UGL) |
1988 |
07.2013 |
07.2013 |
До 05.2013 — Comeng Phase 1 LRV |
1015 |
Comeng Phase I LRV (mod. UGL) |
1988 |
11.2013 |
11.2013 |
До 09.2013 — Comeng Phase 1 LRV |
1016 |
Comeng Phase I LRV (mod. UGL) |
1988 |
09.2012 |
09.2012 |
До 07.2012 — Comeng Phase 1 LRV |
1017 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 05.2012 |
≤ 05.2012 |
До 01.2012 — Comeng Phase 1 LRV |
1018 |
Comeng Phase I LRV (mod. UGL) |
1988 |
13.07.2013 |
18.07.2013 |
До 05.2013 — Comeng Phase 1 LRV |
1019 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≥ 2014 |
|
До ≥ 2014 — Comeng Phase 1 LRV |
1020 |
Comeng Phase I LRV (mod. UGL) |
1988 |
24.06.2013 |
28.06.2013 |
До 05.2013 — Comeng Phase 1 LRV |
1021 |
Comeng Phase I LRV (mod. UGL) |
1988 |
24.11.2012 |
28.11.2012 |
До 10.2012 — Comeng Phase 1 LRV |
1022 |
Comeng Phase I LRV (mod. UGL) |
1988 |
19.12.2013 |
24.12.2013 |
До 11.2013 — Comeng Phase 1 LRV |
1023 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 05.2013 |
≤ 05.2013 |
До 04.2013 — Comeng Phase 1 LRV |
1024 |
Comeng Phase I LRV (mod. UGL) |
1988 |
23.02.2013 |
01.03.2013 |
До 01.2013 — Comeng Phase 1 LRV |
1025 |
Comeng Phase I LRV (mod. UGL) |
1988 |
2010-е гг. |
|
До 2010s — Comeng Phase 1 LRV |
1026 |
Comeng Phase I LRV (mod. UGL) |
1988 |
18.08.2011 |
09.09.2011 |
До 05.2011 — Comeng Phase 1 LRV |
1028 |
Comeng Phase I LRV (mod. UGL) |
1988 |
10.08.2013 |
15.08.2013 |
До 06.2013 — Comeng Phase 1 LRV |
1029 |
Comeng Phase I LRV (mod. UGL) |
1988 |
22.12.2012 |
31.12.2012 |
До 11.2012 — Comeng Phase 1 LRV |
1030 |
Comeng Phase I LRV (mod. UGL) |
1988 |
14.01.2012 |
14.02.2012 |
До 10.2011 — Comeng Phase 1 LRV |
1031 |
Comeng Phase I LRV (mod. UGL) |
1988 |
11.02.2012 |
01.03.2012 |
До 11.2011 — Comeng Phase 1 LRV |
1032 |
Comeng Phase I LRV (mod. UGL) |
1988 |
29.09.2012 |
11.10.2012 |
До 07.2012 — Comeng Phase 1 LRV |
1033 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 12.2012 |
18.12.2012 |
До 10.2012 — Comeng Phase 1 LRV |
1034 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 03.2013 |
20.03.2013 |
До 01.2013 — Comeng Phase 1 LRV |
1035 |
Comeng Phase I LRV (mod. UGL) |
1988 |
05.03.2013 |
08.03.2013 |
До 01.2013 — Comeng Phase 1 LRV |
1036 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 09.2012 |
≤ 09.2012 |
До 06.2012 — Comeng Phase 1 LRV |
1037 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 08.2013 |
≤ 09.2013 |
До 07.2013 — Comeng Phase 1 LRV |
1038 |
Comeng Phase I LRV (mod. UGL) |
1988 |
15.06.2013 |
21.05.2013 |
До 05.2013 — Comeng Phase 1 LRV |
1039 |
Comeng Phase I LRV (mod. UGL) |
1988 |
05.04.2013 |
11.04.2013 |
До 02.2013 — Comeng Phase 1 LRV |
1040 |
Comeng Phase I LRV (mod. UGL) |
1988 |
12.07.2012 |
28.07.2012 |
До 05.2012 — Comeng Phase 1 LRV |
1041 |
Comeng Phase I LRV (mod. UGL) |
1988 |
20.08.2013 |
26.08.2013 |
До 07.2013 — Comeng Phase 1 LRV |
1042 |
Comeng Phase I LRV (mod. UGL) |
1988 |
20.10.2012 |
26.10.2012 |
До 08.2012 — Comeng Phase 1 LRV |
1043 |
Comeng Phase I LRV (mod. UGL) |
1988 |
19.10.2013 |
26.10.2013 |
До 09.2013 — Comeng Phase 1 LRV |
1044 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 12.2011 |
≤ 12.2011 |
До ≈ 09.2011 — Comeng Phase 1 LRV |
1045 |
Comeng Phase I LRV (mod. UGL) |
1988 |
31.05.2012 |
07.06.2012 |
До 02.2012 — Comeng Phase 1 LRV |
1046 |
Comeng Phase I LRV (mod. UGL) |
1988 |
15.11.2012 |
19.11.2012 |
До 09.2012 — Comeng Phase 1 LRV |
1047 |
Comeng Phase I LRV (mod. UGL) |
1988 |
03.11.2012 |
07.11.2012 |
До 09.2012 — Comeng Phase 1 LRV |
1048 |
Comeng Phase I LRV (mod. UGL) |
1988 |
23.07.2013 |
29.07.2013 |
До 06.2013 — Comeng Phase 1 LRV |
1049 |
Comeng Phase I LRV (mod. UGL) |
1988 |
15.11.2011 |
24.11.2011 |
До 07.2011 — Comeng Phase 1 LRV |
1050 |
Comeng Phase I LRV (mod. UGL) |
1988 |
15.02.2013 |
20.02.2013 |
До 12.2012 — Comeng Phase 1 LRV |
1051 |
Comeng Phase I LRV (mod. UGL) |
1988 |
25.04.2011 |
09.05.2011 |
До 12.2011 — Comeng Phase 1 LRV |
1052 |
Comeng Phase I LRV (mod. UGL) |
1988 |
05.12.2013 |
11.12.2013 |
До 10.2013 — Comeng Phase 1 LRV |
1053 |
Comeng Phase I LRV (mod. UGL) |
1988 |
24.09.2011 |
10.10.2011 |
До 05.2011 — Comeng Phase 1 LRV |
1054 |
Comeng Phase I LRV (mod. UGL) |
1988 |
22.01.2013 |
26.01.2013 |
До 12.2012 — Comeng Phase 1 LRV |
1055 |
Comeng Phase I LRV (mod. UGL) |
1988 |
13.04.2013 |
19.04.2013 |
До 03.2013 — Comeng Phase 1 LRV |
1056 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 09.2012 |
13.09.2012 |
До 06.2012 — Comeng Phase 1 LRV |
1057 |
Comeng Phase I LRV (mod. UGL) |
1988 |
31.12.2011 |
30.01.2012 |
До 10.2011 — Comeng Phase 1 LRV |
1058 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≥ 04.2011 |
≈ 06.2011 |
До 12.2010 — Comeng Phase 1 LRV |
1059 |
Comeng Phase I LRV (mod. UGL) |
1988 |
12.2013 |
19.12.2013 |
До 11.2013 — Comeng Phase 1 LRV |
1060 |
Comeng Phase I LRV (mod. UGL) |
1988 |
29.06.2012 |
11.07.2012 |
До 04.2012 — Comeng Phase 1 LRV |
1061 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 06.2012 |
|
До 04.2012 — Comeng Phase 1 LRV |
1062 |
Comeng Phase I LRV (mod. UGL) |
1988 |
01.08.2013 |
09.08.2013 |
До 06.2013 — Comeng Phase 1 LRV |
1063 |
Comeng Phase I LRV (mod. UGL) |
1988 |
07.07.2011 |
30.08.2011 |
До 03.2011 — Comeng Phase 1 LRV |
1064 |
Comeng Phase I LRV (mod. UGL) |
1988 |
05.01.2013 |
11.01.2013 |
До 11.2012 — Comeng Phase 1 LRV |
1065 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 02.2013 |
05.02.2013 |
До 12.2012 — Comeng Phase 1 LRV |
1066 |
Comeng Phase I LRV (mod. UGL) |
1988 |
06.2013 |
11.06.2013 |
До 04.2013 — Comeng Phase 1 LRV |
1067 |
Comeng Phase I LRV (mod. UGL) |
1988 |
19.09.2013 |
25.09.2013 |
До 08.2013 — Comeng Phase 1 LRV |
1068 |
Comeng Phase I LRV (mod. UGL) |
1988 |
≤ 10.2013 |
≤ 11.2013 |
До 09.2013 — Comeng Phase 1 LRV |
1069 |
Comeng Phase I LRV (mod. UGL) |
1988 |
26.11.2013 |
30.11.2013 |
До 10.2013 — Comeng Phase 1 LRV |
1070 |
Comeng Phase I LRV (mod. UGL) |
1988 |
20.10.2011 |
31.10.2011 |
До 06.2011 — Comeng Phase 1 LRV |
1091 |
A. Goninan & Co |
1997 |
|
|
|
1092 |
A. Goninan & Co |
1997 |
|
|
|
1093 |
A. Goninan & Co |
1997 |
|
|
|
1094 |
A. Goninan & Co |
1997 |
|
|
|
1095 |
A. Goninan & Co |
1997 |
|
|
|
1096 |
A. Goninan & Co |
1997 |
|
|
|
1097 |
A. Goninan & Co |
1997 |
|
|
|
1098 |
A. Goninan & Co |
1997 |
|
|
|
1099 |
A. Goninan & Co |
1997 |
|
|
|
1100 |
A. Goninan & Co |
1997 |
|
|
|
1101 |
A. Goninan & Co |
1997 |
|
|
|
1102 |
A. Goninan & Co |
1997 |
|
|
|
1103 |
A. Goninan & Co |
1997 |
|
|
|
1104 |
A. Goninan & Co |
1997 |
|
|
|
1105 |
A. Goninan & Co |
1997 |
|
|
|
1106 |
A. Goninan & Co |
1997 |
|
|
|
1107 |
A. Goninan & Co |
1997 |
|
|
|
1108 |
A. Goninan & Co |
1997 |
|
|
|
1109 |
A. Goninan & Co |
1997 |
|
|
|
1110 |
A. Goninan & Co |
1997 |
|
|
|
1111 |
UGL/CSR |
2009 |
|
|
|
1112 |
UGL/CSR |
2015 |
29.12.2015 |
14.11.2016 |
|
1113 |
UGL/CSR |
2009 |
|
|
|
1114 |
UGL/CSR |
2009 |
|
|
|
1115 |
UGL/CSR |
2009 |
|
|
|
1116 |
UGL/CSR |
2009 |
|
|
|
1117 |
UGL/CSR |
2009 |
|
|
|
1118 |
UGL/CSR |
2015 |
29.12.2015 |
04.09.2016 |
|
1119 |
UGL/CSR |
2009 |
|
|
|
1120 |
UGL/CSR |
2009 |
|
|
|
1121 |
UGL/CSR |
2009 |
|
|
|
1122 |
UGL/CSR |
2009 |
|
|
|
1123 |
UGL/CSR |
2009 |
|
|
|
1124 |
UGL/CSR |
2009 |
|
|
|
1125 |
UGL/CSR |
2009 |
|
|
|
1126 |
UGL/CSR |
2009 |
|
|
|
1127 |
UGL/CSR |
2009 |
|
|
|
1128 |
UGL/CSR |
2009 |
|
|
|
1129 |
UGL/CSR |
2009 |
|
|
|
1130 |
UGL/CSR |
2009 |
|
|
|
1131 |
UGL/CSR |
2009 |
|
|
|
1132 |
UGL/CSR |
2009 |
|
|
|
1133 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2018 |
28.12.2018 |
17.11.2020 |
|
1134 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
05.2020 |
15.03.2021 |
|
1135 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
09.08.2020 |
22.04.2021 |
|
1136 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≥ 12.2020 |
10.08.2021 |
|
1137 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≥ 01.2021 |
30.08.2021 |
|
1138 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
03.2021 |
12.10.2021 |
|
1139 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
05.10.2021 |
09.02.2022 |
|
1140 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 12.2021 |
14.04.2022 |
|
1141 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 12.2021 |
20.04.2022 |
|
1142 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 02.2022 |
08.07.2022 |
|
1143 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 01.2022 |
23.09.2022 |
|
1144 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 01.2022 |
23.09.2022 |
|
1145 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
10.07.2022 |
09.11.2022 |
|
1146 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
10.07.2022 |
09.11.2022 |
|
1147 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 09.2022 |
01.12.2022 |
|
1148 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 09.2022 |
01.12.2022 |
|
1149 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 09.2022 |
03.01.2023 |
|
1150 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
15.09.2022 |
09.01.2023 |
|
1151 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
≤ 09.2022 |
03.01.2023 |
|
1152 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
15.09.2022 |
09.01.2023 |
|
1153 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
26.09.2022 |
03.02.2023 |
|
1154 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
26.09.2022 |
03.02.2023 |
|
1155 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
≤ 11.2022 |
03.03.2023 |
|
1156 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
≤ 11.2022 |
03.03.2023 |
|
1157 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
30.12.2022 |
12.04.2023 |
|
1158 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2022 |
30.12.2022 |
12.04.2023 |
|
1159 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
28.04.2023 |
07.2023 |
|
1160 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
28.04.2023 |
07.2023 |
|
1161 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
23.05.2023 |
24.08.2023 |
|
1162 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
23.05.2023 |
24.08.2023 |
|
1211 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
2018 |
28.12.2018 |
17.11.2020 |
Motorised trailer |
1212 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
05.2020 |
15.03.2021 |
Motorised trailer |
1213 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
08.09.2020 |
22.04.2021 |
Motorised trailer |
1214 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≥ 12.2020 |
10.08.2021 |
Motorised trailer |
1215 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≥ 01.2021 |
30.08.2021 |
Motorised trailer |
1216 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
03.2021 |
12.10.2021 |
Motorised trailer |
1217 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
05.10.2021 |
09.02.2022 |
Motorised trailer |
1218 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 12.2021 |
14.04.2022 |
Motorised trailer |
1219 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 12.2021 |
20.04.2022 |
Motorised trailer |
1220 |
CRRC Nanjing Puzhen PM110 (Phase 5 LRV) |
|
≤ 02.2022 |
08.07.2022 |
Motorised trailer |