Chronologie
25.04.2021 |
The first Green Line of the Taichung MRT (Mass Rail Transit) automated metro opens. The elevated line is 16,7 km-long and has 18 stations. The line is operated with 36 two-car units by Kawasaki/TRSC. |
16.11.2020 |
16-21.11.2020 — Free trial runs of the new Green metro line. Operating hours — 07:00-20:00 |
| Toutes les entrées |
Recherche rapide de véhicule
Photos par ligne
Opérateurs/dépôts de Métro
Maps
City Photo Galleries
Nouvelles photos
» Metro Lines and Infrastructure» Métro — 03, 04, 05, 06, 07, 08, 09, 10, 14, 23, 24, 27, 28, 29, 30, 31, 32.
» Metro Lines and Infrastructure» Métro — 01, 02, 09, 13, 14, 17, 21, 22, 29, 30, 31, 32, 33, 34.
» Maps » Miscellaneous Photos » Metro Lines and Infrastructure
Toutes les mises à jour
|
|
Photo aléatoire

    
|