TransPhotoLinnade elektritransport
Taiwan  
Taiwan

Taichung

臺中 Táizhōng

Metro opened 25.04.2021

Teavitada veast sellel leheküljel  ·  Muudatused andmebaasis

Kommentaarid: kõik · metroo

Kronoloogia

25.04.2021 The first Green Line of the Taichung MRT (Mass Rail Transit) automated metro opens. The elevated line is 16,7 km-long and has 18 stations. The line is operated with 36 two-car units by Kawasaki/TRSC.
16.11.2020 16-21.11.2020 — Free trial runs of the new Green metro line. Operating hours — 07:00-20:00
Kogu kronoloogia vaatamine

Sõiduki kiirotsing

Number:

Pildiotsing marsruudi alusel

Marsruut:

Metroo ettevõtted

Beitun Depot 北屯機廠
G — Green line (Taichung MRT) 臺中捷運綠線
24.1899927504246, 120.7094893338917
Mudelite nimekiri
Aasta ilma fotota


Uued fotod

» Metro Lines and Infrastructure
» Metroo — 03, 04, 05, 06, 07, 08, 09, 10, 14, 23, 24, 27, 28, 29, 30, 31, 32.
» Metro Lines and Infrastructure
» Metroo — 01, 02, 09, 13, 14, 17, 21, 22, 29, 30, 31, 32, 33, 34.
» Maps
» Miscellaneous Photos
» Metro Lines and Infrastructure
Kõik uuendused

Linna aktiivsemad pildistajad

1.koht: Ymtram — 37 foto

Pildistajate täisnimekiri

   

Juhuslik foto



Uued fotod