Izmit
İzmit
Komentāri: visi · tramvajs
Hronoloģija
17.06.2017 |
The tramway operation in the city begins. The new 7,4 km-long line between Sekapark in the west and Otogar (the Bus Station) in the east with 11 stations opens. The depot is located near the Otogar Terminal. Travel time via the entire line is 24 min. The line is operated with 12 Durmazlar Panorama trams built in the city of Bursa. |
| Apskatīt visu hronoloģiju |
Meklēt fotoattēlu maršrutā
Tramvaju uzņēmumi
Maps
City Photo Galleries
Jauni fotoattēli
» Miscellaneous photos» Tramway Lines and Infrastructure» Tramvajs — 4101, 4103, 4105, 4108.
» Tramway Lines and Infrastructure» Tramvajs — 4102.
Visi atjauninājumi
Informācija
Открытие трамвая в 2017 г.
Tramway to open in 2017.
|
|
Izlases foto

    
|
|