TransPhotoTransportul electric urban
Romania  
Vaslui

Vaslui

Editor: Andrei Andras.

Report a mistake on this page  ·  Changes in the Database

Comments: all · trolleybus

Chronology

16.05.2024 Publication of tender for purchase of 13 electric buses (10m) through the National Recovery and Resilience Plan.
18.02.2021 Republication of tender for purchase of 10 trolleybuses (12m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
14.07.2021: contract was signed with Solaris Bus & Coach.
2023: all trolleybuses were delivered.
13.06.2016 A test run with passengers via the reinstated and lengthened single trolleybus line. One of the three ex-Salzburg second-hand trolleybus was used. The new route will receive designation as the Line T. The line is extended from the former Textila Terminal for further 2 km. to Moara Grecilor. The total length of the line will thus constitute 6,5 km. The regular service commencement date is unknown. Trolleybus service was suspended since 07.07.2009.
http://transphoto.ru/photo/910443/
07.07.2009 Closure of the trolleybus operation in the city.
01.05.1994 Opening of the Vaslui trolleybus system.
All Entries

Quick Vehicle Search

Number:

Photos By Route

Traseul:

Trolleybus Facilities / Operators




Active Photographers of the City

1st place: Ymtram — 13 photos
2nd place: Mattis — 5 photos
3rd place: Hugo Buss — 2 photos

Full list of photographers

   

New Photos

4