Trolleybus Lines and Infrastructure
 |
Prague, Škoda 30Tr SOR # 9506 — route 58
Prosecká
Škoda 30Tr SOR pulls the poles up using the pole traps at the beginning of a segment with an overhead on the Line 58 in the westbound direction.
• • •
Троллейбус Škoda 27Tr Solaris поднимает штанги с использованием штангоуловителей в начале участка маршрута 58 с контактной сетью в западном направлении движения.
March 31, 2019 Author: Ymtram
|
 |
Prague, Škoda 27Tr Solaris IV # 9000 — route 58
Prosecká
Škoda 27Tr Solaris pulls the poles down at the eastern end of a segment with an overhead on the Line 58.
• • •
Троллейбус Škoda 27Tr Solaris опускает штанги в восточном конце участка маршрута 58 с контактной сетью.
March 31, 2019 Author: Ymtram
|
 |
Prague, Škoda 27Tr Solaris IV # 9000 — route 58
Prosecká
The eastern end of a segment with an overhead on the Line 58.
The eastbound overhead extends further than the westbound overhead — 1000 meters vs. 800 meters.
Trolleybus Škoda 27Tr Solaris in service just 6 days after delivery.
• • •
Восточный конец участка маршрута 58 с контактной сетью.
Контактная сеть в восточном направление движения — длиннее, чем контактная сеть в западном направлении: 1000 м. против 800 м.
Троллейбус Škoda 27Tr Solaris в обороте всего через 6 дней после поставки.
March 31, 2019 Author: Ymtram
|
 |
Prosecká
Begin of trolleybustrack at station Kelerka
October 14, 2018 Author: D.Möschke
|
 |
Prosecká
Station Kelerka
October 14, 2018 Author: D.Möschke
|
 |
Prosecká
Near station Kundradka
October 14, 2018 Author: D.Möschke
|
 |
Terminál Palmovka
Automaticaly threading
December 21, 2017 Author: D.Möschke
|
 |
Prosecká
Stationsign "Kundradka", its historic flair like other signs at the line 58
October 15, 2017 Author: D.Möschke
|
 |
Prosecká
Building of new short test trolleybus line (about 1 km long) for partial trolleybuses with batteries.
Строительство небольшой новой тестовой троллейбусной линии (длиной около 1 км) для троллейбусов с батареями.
September 25, 2017 Author: Ústečák
|
 |
Prosecká
Building of new short test trolleybus line (about 1 km long) for partial trolleybuses with batteries.
Строительство небольшой новой тестовой троллейбусной линии (длиной около 1 км) для троллейбусов с батареями.
September 25, 2017 Author: Ústečák
|
 |
Prosecká
Building of new short test trolleybus line (about 1 km long) for partial trolleybuses with batteries.
Строительство небольшой новой тестовой троллейбусной линии (длиной около 1 км) для троллейбусов с батареями.
September 25, 2017 Author: Ústečák
|
 |
Old photos
Václavské náměstí Krakovská
Троллейбусная линия.
Скан из журнала "Фотография-86", номер 1 за 1986 год.
Автор фото З. Фейфар
about 1955 Posted by С. Чекалкин
|
Pictures displayed: 12 out of 132
Photos currently sorted by date (New photos listed first).
To the list of systems
|