TransPhotoPilsētas elektrotransports

Metro — [4] Circle Line (CCL)

Singapore

669 KB
147

Dakota Station

30 jūlija 2023 g.
Autors: MirZz

3658 KB
82

Bishan Station

22 aprīli 2023 g.
Autors: Ymtram

4043 KB
125

Singapore,  Alstom Metropolis C830  8083

Salons, aizmugures skats

An interior of an automated train of the Circle Line.

22 aprīli 2023 g.
Autors: Ymtram

4065 KB
106

Singapore,  Alstom Metropolis C830  8083

Salons, skats uz priekšu

An automated train of the Circle Line.

22 aprīli 2023 g.
Autors: Ymtram

4522 KB
144

Paya Lebar Station (CCL)

The Paya Lebar transfer station, the Line 8-9-10 (CCL).

21 aprīli 2023 g.
Autors: Ymtram

3784 KB
150

Serangoon Station (CCL)

The Serangoon transfer station, the Line 8-9-10 (CCL).

21 aprīli 2023 g.
Autors: Ymtram

3322 KB
126

Metro — [3] North East Line (NEL)

Serangoon Station (CCL-NEL)

The Serangoon transfer station corridor between the Line 8-9-10 (CCL) and the Line 6-7 (NEL).

21 aprīli 2023 g.
Autors: Ymtram

471 KB
357

Marymount Station

4 janvāri 2020 g.
Autors: arch.nk


Ir paradīts attēls: 8 no 8
Fotoattēli tiek sakārtoti pēc filmešanas datuma, augša ir jaunākās.

Uz sistēmu sarakstu