TransPhotoTransportul electric urban

Metro — [4] Circle Line (CCL)

Singapore

669 KB
147

Dakota Station

30 July 2023 yr.
Autorul: MirZz

3658 KB
79

Bishan Station

22 April 2023 yr.
Autorul: Ymtram

4043 KB
115

Singapore,  Alstom Metropolis C830  nr. 8083

Interior, view toward back

An interior of an automated train of the Circle Line.

22 April 2023 yr.
Autorul: Ymtram

4065 KB
96

Singapore,  Alstom Metropolis C830  nr. 8083

Interior, view toward front

An automated train of the Circle Line.

22 April 2023 yr.
Autorul: Ymtram

4522 KB
144

Paya Lebar Station (CCL)

The Paya Lebar transfer station, the Line 8-9-10 (CCL).

21 April 2023 yr.
Autorul: Ymtram

3784 KB
150

Serangoon Station (CCL)

The Serangoon transfer station, the Line 8-9-10 (CCL).

21 April 2023 yr.
Autorul: Ymtram

3322 KB
126

Metro — [3] North East Line (NEL)

Serangoon Station (CCL-NEL)

The Serangoon transfer station corridor between the Line 8-9-10 (CCL) and the Line 6-7 (NEL).

21 April 2023 yr.
Autorul: Ymtram

471 KB
356

Marymount Station

4 January 2020 yr.
Autorul: arch.nk


Pictures displayed: 8 out of 8
Photos currently sorted by date (New photos listed first).

To the list of systems