TransPhotoMestská Elektrická Hromadná Doprava

Tram — Closed lines

Lisbon

««12»»
6132 kB
139

Rua Nova da Trindade

Why not have a coffee on top of old tram rails?

28. apríla 2024
Autor: Karalis Arturs

7593 kB
2
180

Largo Trindade Coelho

After roughly 20 years of closure the rails appear almost decorative in the middle of the pedestrian area of the plaza.

28. apríla 2024
Autor: Karalis Arturs

5768 kB
2
176

Cruz Quebrada

Exit (center of photo, cross the street) of Cruz Quebrada terminus loop and a dead end track (under parked cars) going a bit further nort-west.
Note overhead wires go along street in both directions, but tracks only towards Lisbon.
The westernmost tram tracks of the entire Lisbon tram network that have ever existed.

3. februára 2024
Autor: Karalis Arturs

4896 kB
109

Rua Sacadura Cabral

Rua Sacadura Cabral with the closed tram line towards Cruz Quebrada.
Last turn before entering the terminus loop of Cruz Quebrada.

3. februára 2024
Autor: Karalis Arturs

5550 kB
6
186

Rua Sacadura Cabral

Rua Sacadura Cabral with the closed tram line towards Cruz Quebrada.

3. februára 2024
Autor: Karalis Arturs

4578 kB
83

Rua Sacadura Cabral

Rua Sacadura Cabral with the closed tram line towards Cruz Quebrada.
Right behind the photographer, a terminus stop called Dafundo, may have been.

3. februára 2024
Autor: Karalis Arturs

5180 kB
93

Alameda Hermano Patrone

To the right is Alameda Hermano Patrone with the closed tram line towards Cruz Quebrada.
To the left is Avenida Marginal and the Lisbon-Cascais train line.
View away towards Cruz Quebrada.

3. februára 2024
Autor: Karalis Arturs

6104 kB
163

Cruz Quebrada

Exit of terminus loop Cruz Quebrada. There is also a dead end track under the parked cars, ending around 10-20 meters to right of frame.
Note the overhead wires going both ways along the road, but tracks exist only towards Lisbon.
The westernmost tram tracks of the entire Lisbon tram network that have ever existed.

3. februára 2024
Autor: Karalis Arturs

6620 kB
159

Cruz Quebrada

Exit (left, under parked cars) and entrance (in front) to Cruz Quebrada terminus loop.
The westernmost tram tracks of the entire Lisbon tram network that have ever existed.

3. februára 2024
Autor: Karalis Arturs

4989 kB
2
135

Rua Direita do Dafundo

Rua Direita do Dafundo with the closed tram line towards Cruz Quebrada.

3. februára 2024
Autor: Karalis Arturs

5561 kB
102

Rua Direita do Dafundo

Rua Direita do Dafundo with the closed tram line towards Cruz Quebrada.

3. februára 2024
Autor: Karalis Arturs

6512 kB
227

Alameda Hermano Patrone

Tracks going right are the terminus loop of 15E at Algés (Jardim). View is towards Lisbon. Behind the photographer tracks towards closed tram terminus Cruz Quebrada.
Note that the closed line tracks do not cross the active tracks and do not have a junction. There is a junction on the exit of terminus loop with the tracks comming from Cruz Quebrada (not in the photo).

3. februára 2024
Autor: Karalis Arturs

693 kB
2
250

Rua da Alfândega

Tram tracks are still connected with switches to active network at Praça do Comércio, but have no overhead wires.
Last used by route 25.

21. januára 2023
Autor: Karalis Arturs

4833 kB
166

Rua Nova de São Mamede

Line closed in late 1980s or early 1990s, but tracks still exist without overhead wires and not connected to rest of network).
Last used by route 20 (Martim Moniz ⇄ Cais do Sodré)

15. januára 2023
Autor: Karalis Arturs

7148 kB
166

Rua Rodrigo da Fonseca

Line closed in late 1980s or early 1990s, but tracks still exist without overhead wires and not connected to rest of network).
Last used by route 20 (Martim Moniz ⇄ Cais do Sodré)

15. januára 2023
Autor: Karalis Arturs

477 kB
383

Rua Ferreira Borges

29. januára 2020
Autor: D.Möschke

365 kB
533

Calçada da Estrela

29. januára 2020
Autor: D.Möschke

411 kB
384

Avenida Duque de Ávila

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

23. marca 2016
Autor: Palal

446 kB
323

Avenida Duque de Ávila

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

12. marca 2016
Autor: Palal

439 kB
1
445

Avenida Duque de Ávila

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей. На другой стороне видно здание бывшего депо, которое сейчас используется как центр общения с клиентами.

12. marca 2016
Autor: Palal

405 kB
296

Avenida Rovisco Pais

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

29. februára 2016
Autor: Palal

352 kB
473

Rua de Dona Estefânia / Avenida Duque de Ávila

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

23. februára 2016
Autor: Palal

390 kB
306

Avenida Duque de Ávila

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

23. februára 2016
Autor: Palal

437 kB
215

Avenida Duque de Ávila / Avenida Rovisco Pais

Демонтаж рельсов 22 года после закрытия депо Arco do Cego и 7 лет после открытия метро под этой улицей

29. januára 2016
Autor: Palal

383 kB
266

Largo do Carmo

14. augusta 2015
Autor: Дмитрий Золотарёв

286 kB
254

Rua da Trindade

14. augusta 2015
Autor: Дмитрий Золотарёв

305 kB
321

Largo Raphael Bordallo Pinheiro

12. augusta 2015
Autor: Дмитрий Золотарёв

473 kB
530

Praça do Duque da Terceira

Правый путь действующий, левый уже нет

13. mája 2015
Autor: Klessk

478 kB
245

Rua do Alecrim

13. mája 2015
Autor: Klessk

465 kB
3
469

Praça do Duque da Terceira

Годы идут, а пути все на месте.

13. mája 2015
Autor: Klessk


Počet zobrazení: 30 z 35
Fotografie zoradené podľa dátumu snímania, najnovšie navrchu.
««12»»

Na zoznam systémov